Well, in addition to the Speaker Kits this week, I finished up two baby/lap quilts Friday night to unwind after work. That officially dug me out of the hole! I also worked on the latest Harry Potter POD block so I’m caught up on that, and ready to spend the rest of my quilting time today prepping my handwork for the trip. I attached row 9 to the Tula Pink quilt, so I’m preppy row 10 for my travel time.
And packing. Yeesh, the packing!
- Used this Week: 9.25 yards
- 1.5 yd for 5 Emergency Speaker Kits
- 3.75 yd for Grand Illusion Mod Baby quilt
- 4 yd for Music Bricks quilt
- Used year to Date: 62 yards
- Added this Week: 0 yards
- Woohoo!
- Net Used for 2015: 6.75 yards
- YTD Used for Charity: 33 yards (53% of total used)
See more Stash Reports at Patchwork Times!
great way to start your week. Hope Vegas is not too bad.
Have a fantastic time on your work trip. I hope you have enough down time. as a fellow introvert, I get pretty ugly if I don’t have alone time to recharge myself. Here’s hoping it works out for you.
The Tula Pink quilt will be the perfect handwork project. Row ten, huh? I think that’s about where I am too. Have you thought about finishing it? Will you cut the points, square it up and call it done or add a border? I have some extra fabric and am playing around with doing something non-EPP oriented to enlarge it a bit. Thoughts?